Your position£ºHomepage > Investment Environment > Basic Facilities

Basic facilities
¡¡¡¡Water supply: 0.50km away from the Xiangfu waterworks with it's supply power of more than 30,000 ton a day;
¡¡¡¡Electricity supply: electric power capacity of 110,000 kv.
¡¡¡¡Communication: layout of 10,000 program control communication facilities
¡¡¡¡Road: a smooth and free road net with 20m main roads and 12m sub-main roads
¡¡¡¡Sewage: Sewage station with handling capacity of 500tons per day divides the sewage of the park, and will be linked with the main three-dirt pipeline of municipality's in the year of 2003.
¡¡¡¡Gas: Natural gas is the main gas resource. Now processed with liquefied oil, It will be installed gas pine below roads.
¡¡¡¡Virescence: Construction density no more than 40%, and virescence rate no less than 30%

Park layout map:
1. 34 hectares general detailed plane map of Shangcheng Science&technology Industrial Base
2. 200 hectares land use layout map of Shangcheng Science&technology Industrial Base


 

 

Copyright©   HangZhou Shangcheng Science&technology Industrial Base      
Web design by Hangzhou sida electronic technology development Co.Ltd